It’s been 4 months since we moved into our dream home and we’ve accomplished a lot! Here are some updates to our home that we’ve made! Lean to addition for work shopBuilt the frame after installing the posts, then he added the roof.Wood being delivered-board and battenSiding startedFront of the lean to opening for tractorSliding door being installedInside completeInstalling the door trackDoor put on tracks and lean to complete!Workshop projectsAdded stone to shop so that we can pour concrete in the spring.Installed wood stoveInstalled shop lights and air purifierEntry door project-beforeAfter! New door and storm door added!Archway startedArchway to basement complete! Dimmer Recess kitchen lights addedBasement projects continuedRemoval of insulation in basementWas a dirty job but had to be done. Put insulation in 15 contractor bags then vacuumed walls and floors while in space suit. Painted entire basement with mold killing primer. Took 6 gallons and a month to complete start to finish. One person.Also painted the floors-all temporary before we add drywall and carpeting. As well as an e grass window and walkout.
0 Comments
|
MarianI'm a lover of nature, food, and creating. Archives
January 2021
Categories |